D17B Code List 4017

1
Indicates that the scheduling information is a firm commitment.
2
Authorizes the supplier to start the manufacturing of goods.
3
Authorizes the manufacturer to order material required for manufacturing specified goods.
4
An estimate of future requirements based on trends and actual information.
5
Part of a consignment which was not delivered when the original delivery was made.
6
Capacity is available to meet the requested scheduling demands.
7
All related schedule information refer to a promotion.
8
All related schedule information refers to a special demand.
9
The user can interpret the meaning of the values from information exchanged previously.
10
Indicates that the scheduling information is for immediate execution.
11
Initial products required in advance of the normal production process.
12
An estimate of future requirements.
13
The possibility and magnitude of a schedule fluctuation.
14
The usual amount that a manufacturing facility will use over a specified duration.
15
Initial confirmation of a material requirement.
16
The highest attainable amount.
17
The maximum amount that the process was designed to accommodate.
18
The anticipated amount that the process was designed to accommodate over a specific period of time.
19
The preliminary version of a product or service.
20
Product level that is set aside as protection in the event of a work stoppage.
21
The contracted amount that the process was designed to accommodate over a specific period of time.
22
Deliver to schedule separately supplied.
23
Await non-EDI instruction before shipping.
24
The buyer's commitment is the one defined in the commercial agreement.
26
Indicates that the scheduling information is a proposal.