EMSTronic
UN\EDIFACT Directories
VDA Message Types
EDI to XML Converter
D97A Data Element 9011
Return Version
9011
Code identifying a status event.
1
The means of transport has arrived at a location.
2
Permission to load has been given by the responsible party.
3
Goods/consignments/equipment have been received or a means of transport has arrived in a defective condition.
4
Equipment previously the subject of a 'defective condition' status has been returned to service.
5
The process has begun.
6
Goods/consignments/equipment or means of transport have been booked for subsequent movements.
7
The booking of goods/consignments/equipment or means of transport previously booked has been cancelled.
8
Goods/consignments/equipment held for import restriction purposes have been released for import.
9
Goods/consignments/equipment held prior to loading have now been cleared for export.
10
Goods/consignments/equipment have been held prior to shipment and are now cleared for shipment following examination by relevant authority.
11
The port authority has given permission for the goods/consignments/equipment/means of transport to leave the port.
12
Customs have cleared goods/consignments for import/export.
13
Goods/consignments/equipment have been collected from a predetermined location.
14
The process has been completed.
15
Goods/consignments have been added to other goods/ consignments to form a larger consignment and/or have been incorporated into one or more containers/units.
16
Goods/consignments/equipment have crossed a border from one country to another.
17
The Customs authorities have refused to clear the goods/consignments/equipment.
18
Goods/consignments/equipment have been damaged in the course of transportation.
19
Damaged equipment has been assessed and the quotation sent to lessor.
20
Goods/consignments/equipment have been delayed in the course of transportation.
21
The goods/consignments/equipment have been delivered to a location/party in the transport chain.
22
Delivery of the goods/consignments/equipment has been completed as per instructions.
23
Delivery of the goods/consignments/equipment has not been completed in accordance with instructions.
24
The means of transport has departed from a location in the transport chain.
25
The transport has been delayed in departing on the arranged transport action.
26
Equipment has been removed from a position above other equipment on a means of transport.
27
The goods/consignments/equipment have departed from a location in the transport chain.
28
The goods/consignments/equipment have been unloaded from equipment in which they were transported.
29
The goods/consignments/equipment have been unloaded from a means of transport.
30
The package/equipment has been found to be empty.
31
The goods/consignments/equipment are in the normal course of transportation to the next destination.
32
A piece of equipment has been received in after having been sent out for repair.
33
A piece of equipment has been sent out for repair.
34
A damaged piece of equipment has been repaired.
35
The goods/consignments/equipment have been expedited to the next/final destination in the transport chain.
36
The goods/consignments/equipment notified to be missing have not been located.
37
The goods/consignments/equipment previously notified missing have now been located.
38
The freight charges on goods/consignments/equipment have been paid.
39
The goods/consignments/equipment have been moved/are available to be moved from bond.
40
The goods/consignments/equipment have arrived/are available at port.
41
The goods/consignments/equipment have been formally passed from one point in the transport chain to another under responsibility of the same transporter. (See also 'handover delivered'.)
42
The goods/consignments/equipment from one transport operator have been passed to another transport operator. (see also 'handover'.)
43
The goods/consignments/equipment have been received by one transport operator from another transport operator.
44
The goods/consignments/equipment which were previously sent to a wrong destination are on the way to correct destination.
45
The consignee has been informed formally of the arrival at a transit or final destination of goods/consignments/equipment.
46
The goods/consignments/equipment have been moved/is available to be moved into bond.
47
The goods/consignments/equipment have been moved into a LCL (less than container load)/packing depot.
48
The goods/consignments/equipment have been loaded onto a means of transport.
49
The goods/consignments/equipment have been lost in the course of a movement along the transport chain.
50
The goods/consignments/equipment have been included on the list of units moving from one location to another in the transport chain.
51
The means of transport on which the goods/consignments/equipment was being (was to be) moved has been damaged.
52
There has been a mechanical breakdown of the means of transport/equipment on which the goods/consignments/equipment was being (was to be) moved.
53
The goods/consignments/equipment expected to be picked up and conveyed from location to location in the transport chain have not been picked up.
54
The goods/consignments/equipment expected to be located and identified in the transport chain cannot be identified.
55
The goods/consignments/equipment expected to be collected after transportation have not been collected.
56
The goods/consignments/equipment have not been delivered.
57
The goods/consignments/equipment to be loaded onto a means of transport have not been loaded on the expected transport.
58
Equipment previously under hire to a customer has been returned to the lessor and the contract has been terminated.
59
The goods/consignments/equipment previously loaded to a means of transport have been removed from that means of transport before completion of the planned transport.
60
Equipment has been hired out to a hirer/customer.
61
Outstanding claims in respect of goods/consignments/equipment have been settled.
62
Goods/consignments/equipment have been discharged from a means of transport at a specific location when they were not expected to be discharged.
63
The package was not available for collection.
64
Goods/consignments/equipment are awaiting pick-up.
65
Equipment, e.g. a refrigerated container, has been plugged into the power source.
66
The goods/consignments/equipment have been plundered.
67
Goods/consignments/equipment have been positioned on a means of transport.
68
The consignor/consignee has been advised in advance of a transport action.
69
The goods/consignments/equipment have been written off and disposed of.
70
Equipment has been placed above other equipment and placed on a means of transport.
71
Goods/consignments/equipment have been made ready for transportation.
72
The consignee has given full acknowledgement for the receipt of goods.
73
The consignee has not given full acknowledgement for the receipt of goods.
74
Goods/consignments/equipment have been received at a location/party in the transport chain.
75
Goods/consignments/equipment have been consigned to a party other than the original or subsequent consignees.
76
The goods/consignments/equipment which have been delayed will be/have been reforwarded on request by appropriate authority.
77
The transport action/documentation has been refused without explanation.
78
Goods/consignments/equipment have been released to an authorized party.
79
Goods/consignments/equipment have been reloaded onto a means of transport.
80
The goods/consignments/equipment have been returned to a location as per instructions.
81
The goods/consignments/equipment have been returned in a wrecked condition to a location as per instructions.
82
Goods/consignments/equipment have been returned to a previous location.
83
The equipment has been sealed according to operational and governmental requirements.
84
A service has been ordered in relation to the transportation of goods/consignments/equipment.
85
Goods/consignments/equipment expected to be discharged from a means of transport at a specific location have not been discharged.
86
The goods/consignments/equipment expected to be sent to a specific destination on a selected means of transport from a specific location have not been loaded for onward delivery.
87
The goods/consignments/equipment have been sorted erroneously to an incorrect route.
88
The consignment of goods has been split into two or more consignments.
89
The equipment, e.g. a container, has been steam cleaned.
90
The goods/consignments/equipment have been stopped from further movement in the transport chain.
91
The goods/consignments/equipment have been stored at a location.
92
The goods/consignments/equipment have been stowed for transportation in the selected equipment/means of transport.
93
The goods/consignments/equipment have been loaded into a piece of equipment, e.g. a container.
94
The goods/consignments/equipment have been loaded into a piece of equipment and the equipment has been sealed.
95
In the leasing of equipment a sub-lease has been notified to the lessor.
96
In the leasing of equipment a sub-lease has been notified by a lessee.
97
Damaged goods/consignments/equipment have been officially surveyed by a third party to assess the extent of damage.
98
The goods/consignments/equipment have been transferred in from another location.
99
The goods/consignments/equipment have been transferred out to another location.
100
The goods/consignments/equipment have been transhipped to another means of transport.
101
The goods/consignments/equipment has been delayed in transit.
102
The goods/consignments/equipment are not known to the source being enquired upon.
103
Equipment, e.g. a refrigerated container, has been unplugged from the power source at a given location.